Stella Program: Difference between revisions

From DDCIDeos
Jump to navigationJump to search
No edit summary
No edit summary
Line 8: Line 8:
'''Technical Contact:''' mailto:Filip.Verhaeghe@septentrio.com<br>
'''Technical Contact:''' mailto:Filip.Verhaeghe@septentrio.com<br>
'''Management Contact:'''  mailto:Filip.Verhaeghe@septentrio.com<br>
'''Management Contact:'''  mailto:Filip.Verhaeghe@septentrio.com<br>
'''DDC-I Contact:''' [[User:bcronk@ddci.com|Bill]]<br>
'''DDC-I Contact:''' [[User:mdiethelm@ddci.com|Matt]]<br>


'''FTP Drop:'''
'''Customer Data Transfer Site::'''
*ftp support.ddci.com  
*https://deos.ddci.com/upload
*username: septentrio  
*username: septentrio  
*password: Go8r9iD3h
*password: Deo9Sep3rt


== Weekly Status Meetings ==
== Weekly Status Meetings ==

Revision as of 15:33, 15 February 2011

GPS Sensor

Details

Septentrio Greenhill Campus, Interleuvenlaan 15G, 3001 Leuven, Belgium

Hardware: Custom board containing an MPC8313
Expected cert: DAL B, 2011
Components Used: Kernel, PAL, Math, ANSI, Startup, Sockets, MTL, IOI, Boot, LwIP
Technical Contact: mailto:Filip.Verhaeghe@septentrio.com
Management Contact: mailto:Filip.Verhaeghe@septentrio.com
DDC-I Contact: Matt

Customer Data Transfer Site::

Weekly Status Meetings

See project folder in Lotus Notes.

Projects

Milestones Due Date Estimated Delivery Delivered Percentage Complete
[1] Stella Boot Full Functionality 14-JUL-10 17-DEC-10 17-DEC-10 100%
[2] Stella Boot Verf Release 20-APR-11 TBD TBD 0%


Milestones Due Date Estimated Delivery Delivered Percentage Complete
[1] Stella PAL Full Functionality 14-JUL-10 17-DEC-10 17-DEC-10 100%
[2] Stella PAL Verf Release 20-APR-11 TBD TBD 0%


Completed Projects

7.6.1 kernel Cert Work

Task
Assignment
Status
Test Reviews Bill, Gary, Karl, Ryan Done
ABC SCAT Qual Ryan Done
Portal Analysis Gary Done
V-Table Analysis Bill Done
Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed
Formal build (including Conformity inspection) Ryan Done
Before the following can be done the Formal build needs to be completed
Executable Object Code Analysis Note: The howto needs some work here.
- linker invariants Analysis Gary "Done"
- ppc stwcx. instruction Analysis Bill Done
- BIT RAM tests Analysis Aaron Done
- BIT RAM decode tests Analysis Aaron Done
- Required Pad Pool Analysis Bill Done
- Startup CRC Analysis Bill Done
B-Tree analysis Karl Done
Review of above. Gary Done
Requirements Coverage Analysis Karl Done
Before the following can be completed all of the above analysis need to be completed
Run For Score Ryan Done
- Test Results Review Bill Done
Before the following can be done the Run For Score needs to be completed
Structural coverage analysis Aaron & Ryan Done
Before the following can be done the B-Tree analysis and Run For Score needs to be completed
Stack analysis Ryan Done
Before the following can be completed all of the above tasks need to be completed
Back end Docs
- SLCECI Adina Done
- Review of above Gary Done
- SCI Adina Done
- Review of above Gary Done
- Open Problem Reports List Ryan Done
- SAS Gary (construct the draft) Done
SAS requires a note about non-support of non-CLFLUSH processors
Populate the cert archive Adina Done


Milestones Due Date Estimated Delivery Delivered Percentage Complete
[1] Startup Full Functionality Release 08-FEB-10 04-JAN-10 TBD 19%
[2] Startup Test Cases and Procedures TBD TBD TBD TBD
[3] Startup Verified Release 14-APR-10 16-MAR-10 TBD 0%


Milestones Due Date Estimated Delivery Delivered Percentage Complete
[1] EP8343M BSP 11-NOV-09 18-JAN-10 18-JAN-10 100%