ANSI Greys Verf
From DDCIDeos
Jump to navigationJump to search
Verification project for the Greys ANSI library.
Verf complete by 2017-05-04.
Description
Development and verification should use a Greys distribution.
Useful Links
- Query of all outstanding PCRs
- Query of open Rqts/Code PCRs (PCRs with requirements/code work assigned).
- Query of open test PCRs (PCRs with test work assigned).
- mainline review status
Status
We're verifying mainline.
Trace Matrix Warnings
None.
Issues/Concerns
None.
Cert Work
| Initialize Status Files | JON | Done |
| Requirements review | TBR | Done |
| Code Development | JON | Done |
| Code review | TBR | Done |
| Test Case Development | TBR | Done |
| Test Procedure Development | JON | Done |
| Test Reviews | JON, TBR | Done |
| Software life cycle audit: 2017-380.pdf | KL | Done |
| ABC SCAT Qual | JON | Done |
| Integration Review | KL, JON | Done |
| Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed | ||
|---|---|---|
| Formal build 2017-388.pdf | KL, JON | Done |
| Before the following can be done the Formal build needs to be completed | ||
| Executable Object Code Analysis | ||
| Requirements Coverage Analysis | JON | Done |
| Before the following can be completed all of the above analysis need to be completed | ||
| Run For Score: 2017-391.pdf and 2017-394.pdf | JON | Done |
| - Test Results Review | JON | Done |
| Before the following can be done the Run For Score needs to be completed | ||
| Structural coverage analysis | JON | Done |
| Floating Point Analysis | JON | Done |
| Verification audit: 2017-396.pdf | KL | Done |
| Before the following can be completed all of the above tasks need to be completed | ||
| Back end Docs | ||
| - SLCECI | JON | Done |
| - SLCECI review | TBR | Done |
| - SCI | JON | Done |
| - SCI review | TBR | Done |
| - Open Problem Reports List | JON | Done |
| - SAS | JON | Done |
| - SAS review | TBR | Done |
| Populate the cert archive | JON | Done |
| Software conformity audit: 2017-399.pdf | KL | Done |