Baseline Survival 2012

From DDCIDeos
Jump to navigationJump to search

Overview

During 2012, DDC-I will be is maintaining two baselines with conflicting kernel interfaces. The following are survival notes. The Cygwin installer can be used to get the distribution containing the baseline you want to use.

Elbert Distribution

Verification delivery in 2012.

  • kernel: No WAT Support, and soon no MIPS support.
  • No 4.6.1 compilers
  • BSPs: should all be compatible, although regenerating registries may be necessary in some cases.

Unreleased Distribution

Target for 653 + MIPS support, delivery in 2013.

  • kernel: has WAT Support, has MIPS support.
  • Has 4.6.1 compilers

BSPs: If the release notes say 653 support has been added, then they can be used.

Registry Regeneration

 vmware:  Required
 fit-pc2: Required

Regenerating registries

 cd /desk/platform/PlatformName/appbin
 pi -V -g platreg.s  @../etc/platreg.itconf  && makereg
 pi -V -g platregd.s @../etc/platregd.itconf && makereg -d

Then run makeboot as per the platform howto.

The typical failure scenario that indicates that registry regeneration is required is when the network reports:

 no interfaces added