Celestial-BSP

From DDCIDeos
Jump to navigationJump to search

Celestial Boot verification for Celestial Program. Celestial customer's Boot Component: Reference (3.0.0)-> Production (3.y.z)-> Verf'd DAL E (x.y.z).

A DAL A project.

This page tracks development and verification activities and progress.

Issues/Discussions

Planned Production version release date: TBD

Status: ??
Percent of Effort Remaining: ??

Charge Code

Server verification being tracked under Celestial in Project Manager.

Target Availability/Access

Name
Date
Time Wasted Waiting for a celestial Target
Joe Schmoe 6-June 1 hour

Scope

Initial verification of Celestial Boot for Program_Celestial

PAL Activities

Task
Assignment
Status
Creation and Initial Population of Certification Archive (If already created, just perform populate step.) - Boot and PAL JEC Done
PAL Requirements Development Hayden Done
PAL Code Development, i.e. trace tag insertion and additional test points as determined via test development. Hayden Done
Architecture Change Impact Analysis - Boot and PAL Steven Done
Standards Change Analysis - Boot and PAL Steven Done
Initialize Status Files - Boot and PAL Adina/Ignacio Done
PAL Requirements Review Adina/Eliecer Done
PAL Code Review Adina Done
PAL Test Case Development Avionyx Team Done
PAL Test Procedure Development Avionyx Team Done
PAL Test Case Reviews Avionyx Team Done
PAL Test Procedure Reviews Notify SQA when this activity is complete. Avionyx Team Done
PAL Software Life Cycle Audits JEC Done
PAL Compiler Assessment - abc-compiler-assessment-for-powerpc-motorola-elf-gcc-7.3.0-3-20220624-2.s matches. Luis Done
Before the following can be done the Formal Build needs to be completed. Each Executable Object Code Analysis has an analysis and review task.
PAL Executable Object Code Analysis Eliecer Done
PAL Executable Object Code Analysis Review Ignacio Done
Stack Usage Analysis Steven Done
Stack Usage Analysis Review Ignacio Done
Before the following can be done the Run For Score needs to be completed
PAL Structural Coverage Analysis Steven Done

Boot Activities

Task
Assignment
Status
Boot Requirements Development Steven Done
Boot Code Development, i.e. trace tag insertion and additional test points as determined via test development. Eliecer Done
Boot Requirements Review Avionyx Team - Eliecer Done
Boot Code Review Avionyx Team - Ryan Done
Boot Test Case Development Avionyx Team - Ignacio Done
Boot Test Procedure Development Avionyx Team - Ignacio Done
Boot Test Case Reviews Avionyx Team - Steven Done
Boot Test Procedure Reviews Notify SQA when this activity is complete. Avionyx Team - Steven Done
Boot Software Life Cycle Audits JEC Done
Boot Compiler Assessment - abc-compiler-assessment-for-powerpc-motorola-elf-gcc-7.3.0-3-20230110.s Luis Done
ABC SCAT Qual(s) - Boot and PAL Steven Done
Before the following can be done the above activities must be complete
Integration Review - Boot and PAL Steven/JEC Done
Before the following can be done the Requirements Coverage Analysis' traceability needs to be confirmed and ABC Qual needs to be completed
Formal Build (including Conformity Inspection) - Boot and PAL Steven/JEC Done
Before the following can be done the Formal Build needs to be completed. Each Executable Object Code Analysis has an analysis and review task.
Boot Executable Object Code Analysis (requirements *_ANALYSIS_* and Testing vs Release variant equivalence) Steven Done
Boot Executable Object Code Analysis Review Eliecer Done
Dynamic Dispatch Analysis - Boot and PAL Steven Done
Requirements Coverage Analysis (Including Traceaid qualification) - Boot and PAL Steven Done
Limitations Analysis - Boot and PAL Ignacio - Steven Done
Processor Errata Analysis - Boot and PAL Adina - Eliecer Done
Before the following can be completed all of the above analysis need to be completed. The RFS was completed with the expectation the analysis above will be successful.
Run For Score Steven/JEC Done
Test Results Review Steven Done
Before the following can be done the Run For Score needs to be completed
Boot Structural Coverage Analysis Ignacio Done
Verification Audit ON HOLD pending errata resolution JEC Done
Before the following can be completed all of the above tasks need to be completed
Populate the cert archive - Boot and PAL Steven Done
Perform any analysis of differences to any draft docs used in review of Boot or PAL, e.g. pal.sgm, boot.sgm, deos653p1-runtime-user-guide.htm.
Uplink Documents and Draft Uplink Documents
Eliecer Done
Report Documents - Boot and PAL
- SLCECI Steven Done
- SLCECI review KKL Done
- SCI Steven Done
- SCI review KKL Done
Open Problem Reports List (after the final CCB) Steven Done
- SAS Steven Done
- SAS review KKL Done
- Publish Backend Docs: (update analysisStatus.txt) KKL Done
Update /11-14-verf-results/analysis/change-impact/analysisStatus.txt once verification completes on dependencies to include final change-impact analysis.
Update Change-Impact Analysis
Eliecer Done
Software conformity audit JEC Done
Final Steps upon Verf Complete KKL Done