DART Project

From DDCIDeos
Jump to navigationJump to search

Description

Verification project for the Deos Application Run-Time Library.

DART Cert Work

Task
Assignment
Status
Initialize Status Files CC Done
Requirements review LDR Done
Code review LDR Done
Test Case Development PC Done
Test Procedure Development PC Done
DO-178B vs DO-178C Standards Change Analysis. Must include analysis in SAS since started with DO-178B plans. RLF Done
Test Reviews LDR Done
Software life cycle audits KL Done
ABC SCAT Qual JK Done
Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed
Formal build (including Conformity inspection) JK Done
Before the following can be done the Formal build needs to be completed
Requirements Coverage Analysis JK Done
Before the following can be completed all of the above analysis need to be completed
Run For Score JK Done
- Test Results Review JK Done
Before the following can be done the Run For Score needs to be completed
Structural coverage analysis JK Done
Verification audit KL Done
Before the following can be completed all of the above tasks need to be completed
Back end Docs
- SLCECI JK Done
- SLCECI review ML Done
- SCI JK Done
- SCI review ML Done
- Open Problem Reports List JK Done
- SAS JK Done
Populate the cert archive JK Done
Software conformity audit KL Done