DART Project
From DDCIDeos
Jump to navigationJump to search
Description
Verification project for the Deos Application Run-Time Library.
Useful Links
- Query of all outstanding PCRs
- Query of open Rqts/Code PCRs (PCRs with requirements/code work assigned).
- Query of open test PCRs (PCRs with test work assigned).
- mainline review status
- dart regression results 10-03-2014 for monfcm, fit-pc2 qemu-mips, xcalibur1002, p2041rdb
DART Cert Work
| Initialize Status Files | CC | Done |
| Requirements review | LDR | Done |
| Code review | LDR | Done |
| Test Case Development | PC | Done |
| Test Procedure Development | PC | Done |
| DO-178B vs DO-178C Standards Change Analysis. Must include analysis in SAS since started with DO-178B plans. | RLF | Done |
| Test Reviews | LDR | Done |
| Software life cycle audits | KL | Done |
| ABC SCAT Qual | JK | Done |
| Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed | ||
|---|---|---|
| Formal build (including Conformity inspection) | JK | Done |
| Before the following can be done the Formal build needs to be completed | ||
| Requirements Coverage Analysis | JK | Done |
| Before the following can be completed all of the above analysis need to be completed | ||
| Run For Score | JK | Done |
| - Test Results Review | JK | Done |
| Before the following can be done the Run For Score needs to be completed | ||
| Structural coverage analysis | JK | Done |
| Verification audit | KL | Done |
| Before the following can be completed all of the above tasks need to be completed | ||
| Back end Docs | ||
| - SLCECI | JK | Done |
| - SLCECI review | ML | Done |
| - SCI | JK | Done |
| - SCI review | ML | Done |
| - Open Problem Reports List | JK | Done |
| - SAS | JK | Done |
| Populate the cert archive | JK | Done |
| Software conformity audit | KL | Done |