HotDish Revival Boot Verf
From DDCIDeos
Jump to navigationJump to search
2120-320-601; "B" Tasks
A verified Boot for the HotDish Revival program.
Description
A verified Boot for the HotDish Revivial program.
Useful Links
- Query of all outstanding PCRs
- Query of open Rqts/Code PCRs (PCRs with requirements/code work assigned).
- Query of open test PCRs (PCRs with test work assigned).
- mainline review status
Activities
| Requirements Development | pzick | Yes |
| Standards Change Analysis | pzick/tvance | Yes |
| Initialize Status Files | tvance | Yes |
| Requirements review | tvance | Yes |
| Code Development, i.e. trace tag insertion and additional test points as determined via test development. | pzick | Yes |
| Code review | tvance | Yes |
| Test Case Development | tvance | Yes |
| Test Procedure Development | tvance | Yes |
| Test Reviews Notify SQA when this activity is complete. | pzick | Yes |
| Software life cycle audits | jcountryman | Yes |
| ABC SCAT Qual | tvance | Yes |
| Integration Review | pzick/tvance | Yes
|
| Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed | ||
|---|---|---|
| Formal build (including Conformity inspection) | pzick/tvance | Yes |
| Before the following can be done the Formal build needs to be completed. Each executable object code analysis has an analysis and review task. | ||
| Requirements Coverage Analysis | tvance | Yes |
| Before the following can be completed all of the above analysis need to be completed. The RFS was completed with the expectation the analysis above will be successful. | ||
| Run For Score | pzick/tvance/jcountryman | Yes |
| Test Results Review | pzick/tvance/jcountryman | Yes |
| Before the following can be done the Run For Score needs to be completed | ||
| Structural coverage analysis | pzick/tvance | Yes |
| Integration Review completed and signed | pzick/tvance | Yes |
| Verification audit | jcountryman | Yes |
| Before the following can be completed all of the above tasks need to be completed | ||
| Report Documents | ||
| Populate the cert archive | pzick/tvance | Yes |
| - SLCECI | pzick | Yes |
| - SLCECI review | tvance | Yes |
| - SCI | pzick | Yes |
| - SCI review | tvance | Yes |
| - SAS | pzick | Yes |
| - SAS review | tvance | Yes |
| - Open Problem Reports List (after the final CCB) | pzick | Yes |
| Software conformity audit | jcountryman | Yes |