Verification project for the 4.2 IOIAPI Library.
Description
Port code to C11 types and add missing/robust test cases.
The 4.2.x IOIAPI Library is intended for Harrys.
Useful Links
- Query of all outstanding PCRs
- Query of open Rqts/Code PCRs (PCRs with requirements/code work assigned).
- Query of open test PCRs (PCRs with test work assigned).
- mainline review status
Status
We're verifying mainline, closing defects and a few enhancement PCRs.
Trace Matrix Warnings
None
Issues/Concerns
None.
Test global issues
Test Team Needs Guidance
Cert Work
| Standards Change Analysis | RR/GK | Done |
| Architecture Change Impact Analysis | RR/GK | Done |
| Initialize Status Files | Done | |
| Requirements review | Done2 | |
| Code review | Done2 | |
| Test Case Development | Done | |
| Test Procedure Development | Done | |
| Test Reviews | Done2 | |
| Software life cycle audits | JEC | Done |
| ABC Qual | GK | Done |
| Integration Review | GK KL | Done |
| Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed | ||
|---|---|---|
| Formal build (including Conformity inspection) | GK KL | Done |
| Before the following can be done the Formal build needs to be completed | ||
| Executable Object Code Analysis | ||
| Requirements Coverage Analysis | GK | Done |
| Before the following can be completed all of the above analysis need to be completed | ||
| Run For Score | GK KL | Done |
| - Test Results Review | GK | Done |
| Before the following can be done the Run For Score needs to be completed | ||
| Structural coverage analysis | GK | Done |
| Verification audit | KL | Done |
| Before the following can be done the B-Tree analysis and Run For Score needs to be completed | ||
| Stack analysis | Not Applicable | |
| Before the following can be completed all of the above tasks need to be completed | ||
| Back end Docs | ||
| - SLCECI | GK | Done |
| - SLCECI review | RR | Done |
| - SCI | GK | Done |
| - SCI review | RR | Done |
| - Open Problem Reports List | GK | Done |
| - SAS | GK | Done |
| - SAS review | RR | Done |
| Populate the cert archive | GK | Done |
| Software conformity audit | JEC | Done |
| Before the new baseline can be released the following must be completed | ||
| Not applicable | ||