Louie PAL
From DDCIDeos
Jump to navigationJump to search
Louie customer's PAL Component.
A DAL A project.
This page tracks verification activities and progress.
Useful Links
- Query of all outstanding PCRs
- Query of open Rqts/Code PCRs (PCRs with requirements/code work assigned).
- Query of open test PCRs (PCRs with test work assigned).
- mainline review status
- test results: 10/31 [1]
- test results: 10/30 [2]
- test results: 10/24 [3]
Activities
SAS Items to Remember
- Document how Deos PAL reconciles Kernel limitations
- Note to users that they must evaluate Kernel limitations for user provided syncConfigData shared library which is linked to PAL at run-time
- Note to users that they must evaluate the syncConfigData shared library stack usage for the 200 byte limit imposed by the Deos Kernel.
| Requirements Development, i.e. Capture remaining Louie specific features as requirements, and complete dev-kit requirements integration | MH | Done |
| Standards Change Analysis Louie is taking credit for reviews performed as part of Kalbi BSP, Maple BSP, and Kernel. (w. build.log) | GK | Done |
| Initialize Status Files | MH | Done |
| Requirements review | JN,TR | Done |
| Code Development, i.e. trace tag insertion. | MH | Done |
| Code review | various | Done |
| Test Case Development | various | Done |
| Test Procedure Development | various | Done |
| Test Reviews | various | Done |
| Software life cycle audits | KL | Done |
| ABC SCAT Qual | MH | Done |
| Integration Review | KL & MH | Done |
| Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and SCAT Qual need to be completed | ||
|---|---|---|
| Formal build (including Conformity inspection) | KL & MH | Done |
| Before the following can be done the Formal build needs to be completed | ||
| Executable Object Code Analysis pollForSystemTick()(SRS_PAL_TICK_ANALYSIS_100) | MD/JK | Done |
| Review - Executable Object Code Analysis pollForSystemTick()(SRS_PAL_TICK_ANALYSIS_100) | GK | Done |
| Executable Object Code Analysis PALidleFunction()(SRS_PAL_IDLE_ANALYSIS_10) | MD/JK | Done |
| Review - Executable Object Code Analysis PALidleFunction()(SRS_PAL_IDLE_ANALYSIS_10) | GK | Done |
| Stack Usage Analysis | JK | Done |
| Review - Stack Usage Analysis | GK | Done |
| Requirements Coverage Analysis | GK | Done |
| Limitation Analysis | MD | Done |
| Before the following can be completed all of the above analysis need to be completed | ||
| Run For Score | KL & MH | Done |
| Test Results Review | MH | Done |
| Before the following can be done the Run For Score needs to be completed | ||
| Structural coverage analysis | MH | Done |
| Verification audit | KL | Done |
| Before the following can be completed all of the above tasks need to be completed | ||
| Report Documents | ||
| - SLCECI | MD | Done |
| - SLCECI review | MH | Done |
| - SCI | MD | Done |
| - SCI review | MH | Done |
| - Open Problem Reports List | MH | Done |
| - SAS | MD | Done |
| - SAS review | MH | Done |
| Populate the cert archive | MH | Done |
| Software conformity audit | KL | Done |