Target Data Loader Project
From DDCIDeos
Jump to navigationJump to search
The Target Data Loader (TDL) is a collection of software components that implement a subset of the ARINC 615A and ARINC 615-3 loading protocols. It consists of a Main Process, Integrity Library and Custom Library. It also uses the TFTP Library.
All components are DO-178B level E except for the Integrity Library, which is level A.
Current activities include bringing all components up-to-date for their first release by DDC-I. The development of a custom library for the Hosmer program is also part of this project.
Integrity Library Useful Links
- Query of all outstanding PCRs
- Query of open Rqts/Code PCRs (PCRs with requirements/code work assigned).
- Query of open test PCRs (PCRs with test work assigned).
- mainline review status
Charge Code
Activities
| Description | Assignee | Status |
| Requirements Development | MDV | Done |
| Standards Change Analysis | MDV | Done |
| Architecture Change Impact Analysis | MDV | Done |
| Initialize Status Files | MDV | Done |
| Requirements review | CP | Done |
| Code Development, i.e. trace tag insertion and additional test points as determined via test development. | MDV | Done |
| Code review (awaiting accept of code checklist) | CP | Done |
| Test Case Development | CP | Done |
| Test Procedure Development | MDV | Done |
| Test Reviews Notify SQA when this activity is complete. | MDV, CP | Done |
| Software life cycle audits | JEC | Done |
| ABC SCAT Qual | MDV | Done |
| Before the following can be done the above activities must be complete | ||
|---|---|---|
| Integration Review | MDV | Done |
| Before the following can be done the Requirements Coverage analysis' traceability needs to be confirmed and ABC Qual need to be completed | ||
| Formal build (including Conformity inspection) | MDV | Done |
| Before the following can be done the Formal build needs to be completed. Each executable object code analysis has an analysis and review task. | ||
| Executable Object Code Analysis (Testing vs Release variant equivalence) | ||
| Executable Object Code Analysis Review (Testing vs Release variant equivalence) | ||
| Requirements Coverage Analysis | MDV | Done |
| Before the following can be completed all of the above analysis need to be completed. The RFS was completed with the expectation the analysis above will be successful. | ||
| Run For Score | MDV/JEC | Done |
| Test Results Review | MDV | Done |
| Before the following can be done the Run For Score needs to be completed | ||
| Structural coverage analysis | MDV | Done |
| Verification audit | JEC | Done |
| Before the following can be completed all of the above tasks need to be completed | ||
| Report Documents | ||
| - Open Problem Reports List | RDR/MDV | Done |
| - Create Backend Docs: SLCECI, SCI and SAS | RDR/MDV | Done |
| - Review and Publish Backend Docs: (update analysisStatus.txt) | MS | Done |
| Populate the cert archive | MDV | Done |
| Software conformity audit | JEC | Done |