This page contains minutes from weekly Verf Team meetings.

Meeting Notes

22-Feb-2023

  • Johan:
  1. gnu-language:
    • Verf complete by 2/28/2023
  2. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • One remaining high-priority issue to be included in the next stable release of Ada compiler, which will ship to Tostones
    • Tostones final DDS to ship TBD
  • David:
  1. SAL test reviews
  2. Deos-time test reviews
  • Gibbs:
  1. SAL test reviews (and making SAL tests great again, and still lovin' it)
  • John:
  1. SAL verf
    • Another stable release on 2/27 (Monday)
    • SAL test reviews - complete by 3/3
    • Verf complete by 3/10/2023
  • Richard:
  1. SAL test reviews - complete by 3/3
  • Mark (aka Danger):
  1. SAL tests: support reviews from Gibbs, John, Richard, David, and now Ron
    • status: Over half way there! 99 files reviewed/approved, 67 remaining
    • problem discovered with debug version of executable software (fix will be deferred until next baseline/verf)
    • Summary of SAL updates: Requirements increased 50%, branches increased 2.5x, the original test suite was crap.
  2. TIME test updates
    • No progress. Large amount of TIME requirements/code updated recently

15-Feb-2023

  • Johan:
  1. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering releases to continue with fixes; wait for feedback before creating DDS; Kelly coordinating shipments to HI
    • Need a stable version of the Ada compiler no later than 2/17 to ship to Tostones (with the final DDS)
  2. gnu-language:
    • Verf complete by 2/17/2023
    • PCR:12463 requires test case update
    • Johan/Richard: determine if additional analyses are required, based on the updates for deos653-runtime (would only impact code analysis requirement tags, ie, not test updates).
    • Executable object code analysis - Ryan?
    • Kelly: determine if there's an x86 target on the farm that has been used for Jupiter RFS
  • David:
  1. gnu-language: update test case for PCR 12463
  2. SAL test reviews: primary task
  3. Deos-time test reviews
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/15/2023)
  • Gibbs:
  1. SAL test reviews (and making SAL tests great again)
  • John:
  1. abc-tool-6.11.0 went stable on 1/26
  2. SAL verf
    • SAL test reviews - complete by 2/24
    • Stable release by 2/17 (cert candidate)
  • Richard:
  1. SAL test reviews - complete by 2/24
  2. dpaa-prl reviews next
  • Mark (aka Danger):
  1. SAL tests: support reviews from Gibbs, John, Richard and David (on-going)
    • status: Over half way there! 86 files reviewed/approved, 80 remaining
  2. TIME test updates
    • No progress. Expecting updated TIME requirements/code updates soon

08-Feb-2023

  • Johan:
  1. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering releases to continue with fixes; wait for feedback before creating DDS; Kelly coordinating shipments to HI
    • Need a stable version of the Ada compiler no later than 2/17 to ship to Tostones (with the final DDS)
  2. gnu-language:
    • Verf complete by 2/17/2023
    • PCR:12463 requires test case update
    • Johan/Richard: determine if additional analyses are required, based on the updates for deos653-runtime (would only impact code analysis requirement tags, ie, not test updates).
    • Executable object code analysis - Ryan?
    • Kelly: determine if there's an x86 target on the farm that has been used for Jupiter RFS
  • David:
  1. gnu-language: update test case for PCR 12463
  2. SAL test reviews: primary task
  3. Deos-time test reviews
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/15/2023)
  • Gibbs:
  1. SAL test reviews (and still loving every minute of it)
  • John:
  1. abc-tool-6.11.0 went stable on 1/26
  2. SAL verf
    • SAL test reviews - complete by 2/24
    • Stable release by 2/17 (cert candidate)
  • Richard:
  1. SAL test reviews - complete by 2/24
  2. dpaa-prl reviews next
  • Mark (aka Danger):
  1. SAL tests: support reviews from Gibbs, John, Richard and David (on-going)
    • status: 53 files reviewed/approved, 113 remaining
  2. TIME test updates
    • Limited progress due to supporting SAL
    • Providing feedback to developer on dead code and other issues discovered

01-Feb-2023

  • Johan:
  1. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering releases to continue with fixes; wait for feedback before creating DDS; Kelly coordinating shipments to HI
    • Need a stable version of the Ada compiler no later than 2/17 to ship to Tostones (with the final DDS)
  2. gnu-language:
    • Verf complete by 2/17/2023
    • Will NOT include x86 verf
    • Kelly: determine if there's an x86 target on the farm that has been used for Jupiter RFS
  • David:
  1. gnu-language: "done"
  2. SAL test reviews: primary task
  3. Deos-time test reviews
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/15/2023)
  • Gibbs:
  1. SAL test reviews (and loving every minute of it)
  • John:
  1. abc-tool-6.11.0 went stable on 1/26
  2. SAL verf
    • SAL test reviews - complete by 2/3/2023
    • RFS activities - complete 2/17/2023 (sporty)
  • Richard:
  1. SAL test reviews - complete by 2/10/2023?
  2. dpaa-prl reviews next
  • Mark (aka Danger):
  1. gnu-language test reviews: DONE, DONE, and DONE
  2. SAL tests: support reviews from Gibbs, John, and Richard (on-going)
    • status: 31 files reviewed/approved, 135 need to be reviewed
  3. TIME test updates
    • Still trying to get the new infrastructure established (with much needed advice from Ron)
    • Limited progress on actual test development (2 test procedures "mostly" working)

25-Jan-2023

  • Johan:
  1. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering releases to continue with fixes; wait for feedback before creating DDS; Kelly coordinating shipments to HI
  2. gnu-language:
    • Reqs and Code (trace tag) fixes for .c file support to be committed today
    • Verf complete by 2/17/2023
  • David:
  1. gnu-language:
    • Confirmed abc-tool fix; remaining holes require justification (point to the analysis)
    • Working cleanup and structural coverage (90-ish holes) atomics only (TLS is 100%)
    • Atomic C standard: Update tests for stdatomic.h to use .c test file (in addition to .cpp)
      • Header file check should use the correct compiler based on file type; works now!
    • Test review feedback complete by 2/3/2023
  2. SAL test reviews: background task
  3. Deos-time test reviews
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/15/2023)
  • Gibbs:
  1. SAL test reviews
  • John:
  1. abc-tool go stable on 1/26; analysis shows the issue is unlikely to occur on other components (would have shown up as differences in test results on the different variants)
  2. SAL verf
    • SAL test reviews - complete by 2/3/2023
    • RFS activities - complete 2/17/2023
  • Richard:
  1. gnu-language code reviews - complete! (Until the next update - David to perform Req and Code reviews)
  2. SAL test reviews - complete by 2/3/2023
  • Mark (aka Danger):
  1. gnu-language test reviews: only 3 test files remaining to review; should be done this week (schedule complete Feb 3, 2023)
  2. SAL tests: support reviews from Gibbs and Richard (on-going)
    • status: 16 files reviewed/approved, 151 need to be reviewed
  3. TIME test updates
    • I have the partially completed tests from 18 months ago working with the current test environment (thanks to Ron's help)
    • Limited progress on actual test development.

18-Jan-2023

  • Johan:
  1. ANSI verf done!
  2. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering releases to continue with fixes; wait for feedback before creating DDS; Kelly coordinating shipments to HI
  3. gnu-language:
    • code review feedback: scheduled for 1/31/2023; looking good to be complete by 1/20/2023
    • Coverage holes and test failure (instrumented optimized only) - abc-tool issue
    • Verf complete by 2/17/2023
  • David:
  1. gnu-language:
    • Confirm abc-tool fix; remaining holes require justification (point to the analysis)
    • Working cleanup and structural coverage (99 holes)
    • Atomic C standard: Update tests for stdatomic.h to use .c test file (in addition to .cpp); create PCR
      • Header file check should use the correct compiler based on file type; why didn't this work?
    • Test review feedback complete by 2/3/2023
  2. SAL test reviews: background task
  3. Deos-time tests - waiting for Matt to mark Reqs and Code RFR
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/15/2023)
  • Gibbs:
  1. gnu-language:
    • Code reviews - complete!
  2. SAL test reviews
  • John:
  1. abc-tool update for gnu-language; include assessment of impact on components that have completed verf in PCR:14767
  2. SAL verf
    • SAL test reviews - complete by 2/3/2023
    • RFS activities - complete 2/17/2023
  • Richard:
  1. gnu-language code reviews - complete this week
  2. SAL test reviews - complete by 2/3/2023
  • Mark (aka Danger):
  1. gnu-language test reviews: only 14 test files remaining to review; should be done next week (schedule complete Feb 3, 2023)
  2. SAL tests: support reviews from Gibbs and John (on-going)
  3. Started TIME test updates: very little progress last week

11-Jan-2023

  • Johan:
  1. ANSI verf wrap up - let Kelly know when RFR
  2. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering release (tarball with 2 executables) to shipped Jan 6; 2nd patch ready by 1/12; wait for feedback before creating DDS; Kelly coordinating shipments to HI
  3. gnu-language:
    • code review feedback: complete by 1/31/2023
    • Help with coverage holes and test failure (instrumented optimized only)
    • Verf complete by 2/17/2023
  • David:
  1. gnu-language:
    • Working cleanup and structural coverage (99 holes) - need to be tested by analysis
    • Update tests for stdatomic.h to use .c test file (in addition to .cpp); create PCR
    • Test review feedback complete by 2/3/2023
  2. SAL test reviews: background task
  3. Deos-time tests - waiting for Matt to mark Reqs and Code RFR
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/15/2023)
  • Gibbs:
  1. gnu-language:
    • Code reviews - complete by 1/31/2023
    • Process non-compliance PCR for code checklist deviation; add PCR to code review packet(s) dealing with bool
  2. Next: SAL test reviews
  • John:
  1. SAL verf
    • SAL test reviews - complete by 2/3/2023
    • RFS activities - complete 2/17/2023
  • Richard:
  1. gnu-language code reviews - complete by 1/31/2023
  2. SAL test reviews - complete by 2/3/2023
  • Mark (aka Danger):
  1. gnu-language test reviews: complete Feb 3, 2023
  2. SAL tests: support reviews (on-going)
  3. Started TIME test updates (primarily test cases)

4-Jan-2023

  • Johan:
  1. Ada compiler support cases for Lake Pleasant Brewery (LPB)
    • Engineering release (tarball with 2 executables) to ship Jan 6 (to enable data collection from HI); Richard is coordinating ship date with HI
    • Additional engineering releases may be needed, followed by a formal DDS (ship date TBD)
  2. gnu-language:
    • Gibbs and Richard code reviews complete by 1/31/2023
    • Help with coverage holes and test failure (instrumented optimized only)
    • Verf complete by 2/17/2023
  • David:
  1. gnu-language:
    • Working cleanup and structural coverage (99 holes) - need to be tested by analysis
    • Update tests for stdatomic.h to use .c test file (in addition to .cpp); create PCR
  2. SAL test reviews: background task
  3. Deos-time tests - waiting for Matt to mark Reqs and Code RFR
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/31/2023)
  • Gibbs:
  1. gnu-language:
    • Code reviews - complete by 1/31/2023
    • Process non-compliance PCR for code checklist deviation; add PCR to code review packet(s) dealing with bool
  2. dpaa-prl next!
  • John:
  1. Kernel code reviews complete by 1/6/2023
  2. SAL verf
    • SAL test reviews - complete by 2/3/2023
    • RFS activities - complete 2/17/2023
  • Richard:
  1. gnu-language code reviews - complete by 1/31/2023
  2. SAL test reviews - complete by 2/3/2023
  • Mark (aka Danger): working from Granada starting 1/9
  1. SAL tests: support reviews (on-going)
  2. gnu-language test reviews: complete Feb 3, 2023

14-Dec-2022

  • Johan:
  1. adarts and ada-root: verf complete by 12/15 - Looking good!
    • Kelly to review BE docs (done)
    • Richard to review analysis reports (in progress)
    • Resolve Tostones DDS issues (scheduled to ship on 12/22)
  2. gnu-language:
    • Gibbs reviewing Reqs - complete by 12/23
    • Gibbs and Richard reviewing code
  3. Vernon support cases
    • New PO for Ada compiler features expected
    • Provide ETA for providing fixes for Vernon support cases
  • Gibbs:
  1. gnu-language:
    • Reqs reviews - complete by 12/9/2022
    • Code reviews - complete by 1/31/2023
  • David:
  1. gnu-language:
    • Working cleanup and structural coverage (99 holes) - need to be tested by analysis
    • Update tests for stdatomic.h to use .c test file (in addition to .cpp); create PCR
  2. SAL test reviews
  3. Deos-time tests - waiting for Matt to mark Reqs and Code RFR
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/31/2023)
  • John: MIA
  1. Kernel code reviews complete by 12/16
  2. SAL verf
    • Working feedback from testing
    • SAL test reviews and RFS activities by complete 1/27/2023 (not realistic!)
  3. abc-tool support
  4. LwIP support
  • Richard:
  1. kernel code reviews - done with all possible reviews (with independence)
  2. SAL code views - should go quickly
  3. gnu-language code reviews - complete by 1/31/2023
  • Mark (aka Danger):
  1. SAL tests: Knocking out the few remaining structural coverage holes.
    1. Structural coverage at 99% on ARM and 97% on PPC.
  2. SAL tests: support reviews (on-going)
  3. gnu-language test reviews (start as soon as 12/15) - to be complete Feb 3, 2023

07-Dec-2022

  • Johan:
  1. adarts and ada-root: verf complete by 12/15
    • Kelly to review BE docs
    • Richard to review analysis reports
  2. gnu-language: stable release done
    • Gibbs reviewing Reqs - complete by 12/23
    • Richard and Gibbs reviewing Code
    • Potential issue related to HI support case KLED-CLPVY5?
  3. Vernon support cases
    • New PO for Ada compiler features expected - working Vernon's support cases
  • Gibbs:
  1. gnu-language:
    • Reqs reviews - complete by 12/9/2022
    • Code reviews - complete by 1/31/2023
  • David:
  1. gnu-language:
    • Working cleanup and structural coverage (99 holes) - need to be tested by analysis
    • Update tests for stdatomic.h to use .c test file (in addition to .cpp); create PCR
  2. SAL test reviews
  3. Deos-time tests - waiting for Matt to mark Reqs and Code RFR
    • Note: deos-time library compatible with RTEMS is needed by HI (by 2/16/2023); verified version needed by Bell (by 3/31/2023)
  • John:
  1. Kernel code reviews complete by 12/16
  2. SAL verf
    • Working feedback from testing
    • SAL test reviews and RFS activities by complete 1/27/2023 (not realistic!)
  3. abc-tool support
  4. LwIP support
  • Richard:
  1. kernel code reviews - done with all possible reviews (with independence)
  2. SAL code views - should go quickly
  3. gnu-language code reviews - complete by 1/31/2023
  • Mark (aka Danger):
  1. SAL tests: Working on last test procedure: gethostbyname(). Completion: 12/9
    1. All test files except those associated with TCS108 are marked 'ready for review'
    2. John provided an updated test utility (thank you, John!)
    3. Structural coverage at 96% (51 structural branches remaining)
  2. SAL tests: support reviews (???)
  3. gnu-language test reviews (start as soon as 12/8)

30-Nov-2022

  • Johan:
  1. gnu-language Reqs and Code review feedback
    • stable release by 12/8; use regress test suite
  2. adarts and ada-root: BE docs RFR 12/9
    • Verf complete by 12/15
    • Ship tostones DDS to Vernon too
  3. New PO for Ada compiler features expected - working Vernon's support cases
  • David:
  1. gnu-language tests for atomics for C++ done!
    • Working structural coverage; All tests marked RFR by Dec 2
  2. Deos-time tests - Kelly to set up meeting to identify time reqs; standard POSIX APIs drive reqs?
  • John:
  1. Kernel code reviews complete by 12/16
  2. abc-tool support
  3. SAL verf
    • Working feedback from testing
    • SAL test reviews and RFS activities by complete 12/30
  4. LwIP support
  • Richard:
  1. kernel code reviews
  2. SAL code views - should go quickly
  3. gnu-language reqs/code reviews (new task)
  • Mark (aka Danger):
  1. SAL tests: Working on last major issue (gethostbyname test). Completion: 12/9
    1. John is helping with gethostbyname (thank you, John!)
    2. Currently have 42 of the 43 tests working
    3. Structural coverage at 96% (51 structural branches remaining)
  2. SAL tests: support reviews (???)
  3. gnu-language test reviews (start by TBD)

16-Nov-2022

  • Johan:
  1. gnu-language Reqs and Code updates by 11/18; enables David to make progress on tests
  2. adarts and ada-root: RFS done! Stable too.
    • Possible issue with adarts - working with Lisa on failing example for Tostones
    • Verf complete by TBD - waiting for p1-runtime (stack analysis)
  3. New PO for Ada compiler features expected this week
    • Compiler issues (support cases) to be addressed asap; updated compiler could be provided to Tostones after score components are verf complete.
  • David:
  1. gnu-language tests for atomics for C++ by TBD
    • All C tests marked RFR
  2. Deos-time tests (on HOLD) - Kelly to set up meeting to identify time reqs; standard POSIX APIs drive reqs?
  • John:
  1. Kernel code reviews complete by 12/16
  2. abc-tool support
  3. SAL verf
    • Working feedback from testing
    • SAL test reviews and RFS activities by complete 12/30
  4. LwIP support
  • Richard:
  1. p1 RFS this week - verf complete by 11/18
  2. kernel code reviews
  3. SAL code views - should go quickly
  4. gnu-language reqs/code reviews (new task)
  • Mark (aka Danger):
  1. SAL tests: ready for review (11/18 .. at risk) ... 12/9 is more likely
    1. Currently have 39 of the 43 tests working
    2. Structural coverage at 94% (72 structural branches remaining)
  2. SAL tests: support reviews (???)
  3. gnu-language test reviews (start TBD)

09-Nov-2022

  • David:
  1. gnu-language tests for atomics for C++ by TBD
    • All C tests marked RFR
    • 2 PPC tests failing; question on testing volatile reqs
  2. Deos-time tests (on HOLD) - Kelly to set up meeting to identify time reqs; standard POSIX APIs drive reqs?
  • Johan:
  1. gnu-language Reqs and Code updates by 11/18; enables David to make progress on tests
  2. adarts and ada-root: RFS done! Stable too.
    • Verf complete by TBD - waiting for p1-runtime (stack analysis)
  3. Kernel verf tasks (code reviews or analyses??)
  4. New PO for Ada compiler features expected this week
  • John:
  1. Kernel code reviews complete by 12/16
  2. abc-tool support
  3. SAL test reviews and RFS activities by complete 12/30
  • Richard:
  1. p1 RFS prep (in work)
    • p1 release asap for ARM and PPC
    • p1 reqs and code feedback - done
    • Misc p1 test reviews - done
  2. kernel code reviews
  3. SAL code views
  4. gnu-language reqs/code reviews (new task)
  • Mark (aka Danger):
  1. SAL tests: update to latest code/requirements changes (including structural coverage) (11/18 .. at risk)
    1. Currently have 37 of the 42 tests working
    2. Structural coverage at 92%!
    3. Reqs went from 295 to 426; SLOC increased from 2800 to 4500; branches increased 552 to 1313
  2. SAL tests: support reviews (???)
  3. A653 Runtime support - as needed
  4. gnu-language test reviews (start TBD)

02-Nov-2022

  • David:
  1. gnu-language tests for atomics by TBD
  2. Deos-time tests (on HOLD) - Kelly to set up meeting to identify time reqs; standard POSIX APIs drive reqs?
  • Johan:
  1. gnu-language Reqs and Code updates by 11/18; enables David to make progress on tests
  2. adarts and ada-root: RFS done! Stable too
    • Verf complete by TBD - waiting for p1-runtime (stack analysis)
  3. Kernel verf tasks (code reviews or analyses??)
  • John:
  1. Kernel code reviews complete by 12/16
  2. abc-tool support
  3. SAL test reviews and RFS activities by complete 12/30
  • Richard:
  1. p1 release asap for ARM and PPC
  2. p1 reqs and code feedback - waiting on atomics support (precondition in P1 code file needs to be documented in gnu-language UG) - follow up with Johan
  3. p1 RFS prep (in work)
  4. Misc p1 test reviews (common files and p1 runtime files)
  5. kernel code reviews
  6. SAL code views
  7. gnu-language reqs/code reviews (new task)
  • Mark (aka Danger):
  1. SAL requirement reviews (DONE .. until more reviews are needed)
  2. SAL tests: update to latest code/requirements changes (including structural coverage) (11/18)
    1. Currently have 37 of the 42 tests working
    2. Structural coverage at 92%! No new tests, just updates to existing tests
  3. SAL tests: support reviews (???)
  4. A653 Runtime test support - TP1202 needs an easy fix to run on the Celestial target
  5. gnu-language test reviews (start TBD)

26-Oct-2022

  • Johan: Out today
  1. gnu-language Reqs and Code updates by 11/18; enables David to make progress on tests
  2. adarts and ada-root: RFS done!
    • Verf complete by TBD - waiting for p1-runtime (stack analysis)
  3. Kernel verf tasks (code reviews or analyses??)
  • John:
  1. SAL reqs and code feedback incorporated - done!
  2. Kernel code reviews complete by 12/16
  3. abc-tool support
  4. SAL test reviews and RFS activities by complete 12/30
  • Richard:
  1. p1 release asap for ARM and PPC
  2. p1 reqs and code feedback - waiting on atomics support (precondition in code file needs to be documented in gnu-language UG) - follow up with Johan
  3. p1 RFS prep (in work)
  4. Misc p1 test reviews (common files and p1 runtime files)
  5. kernel code reviews (background task)
  6. gnu-language reqs/code reviews (new task)
  7. SAL req and code reviews feedback - week of 10/14
  8. 653 committee meeting in Lisbon, Portugal Oct 17-21
  • David:
  1. gnu-language tests for atomics by TBD
  2. Deos-time tests (on HOLD) - Kelly to set up meeting to identify time reqs; standard POSIX APIs drive reqs?
  • Mark (aka Danger):
  1. SAL requirement reviews (10/27)
  2. SAL tests: update to latest code/requirements changes (including structural coverage) (11/18)
  3. SAL tests: support reviews (???)
  4. A653 Runtime test support - as needed
  5. gnu-language test reviews (start TBD)

19-Oct-2022

  • Jerry:
  1. 653p2: RFS this week; verf complete by 10/28
    • targets: ARM=zcu102 or imx8qm; PPC=t2080, nai68ppc2
  2. Vfile testing
  3. NORflash MAL for shire (D4) - waiting on funding
  4. Final verf team meeting
  • David:
  1. gnu-language tests for atomics by TBD
  2. Deos-time tests
  • Johan:
  1. adarts and ada-root: formal build; need CCB
    • RFS - In work (week of Oct 17)
    • Verf complete by 11/4
  2. gnu-language Reqs and Code updates by 11/18; enables David to make progress on tests
  3. Kernel verf tasks (code reviews or analyses??)
  • John:
  1. SAL reqs and code feedback incorporated - 10/20
  2. Kernel code reviews (started) by 11/30
  3. SAL test reviews and RFS activities by 12/30
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support (no impacts to tests)
  2. p1 RFS prep (in work)
  3. Misc p1 test reviews (common files and p1 runtime files)
  4. kernel code reviews (background task)
  5. gnu-language reqs/code reviews (new task)
  6. SAL req and code reviews feedback - week of 10/14
  7. 653 committee meeting in Lisbon, Portugal Oct 17-21
  • Mark (aka Danger):
  1. SAL tests: update to latest code/requirements changes (including structural coverage) (11/18)
  2. SAL tests: support reviews (???)
  3. gnu-language test reviews (start TBD)
  4. A653 Runtime test support - as needed

12-Oct-2022

  • Jerry:
  1. 653p2: RFS stuff (In work) - 14 Oct
  2. Vfile testing
  3. NORflash MAL for shire (D4) - waiting on funding
  • David:
  1. kernel test reviews - wrap up current packet
  2. gnu-language tests for atomics - provide feedback to Johan on req tracing format before Friday
  3. SAL test reviews (waiting on Mark)
  • Johan:
  1. adarts and ada-root: test run in progress; need CCB tomorrow
    • RFS - In work (week of Oct 10)
  2. gnu-language Reqs and Code updates; enables David to make progress on tests
  3. ada examples + OpenArbor - post RFS updates
  4. ToDo Kelly: add task to PM.com (customer & sales support)
  • John:
  1. abc-tool updates for Ada: 6.11.0 stable! Created PCR:14581, PCR:14582 as documentation on qualifying abc-tool for Ada components (using gcc instead of tcc compiler)
  2. SAL reqs and code feedback incorporated - 10/14
  3. Kernel code reviews (highest priority after SAL)
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support (no impacts to tests)
  2. p1 RFS prep (in work)
  3. Address structural coverage holes (DONE-ish)
  4. kernel code reviews (background task)
  5. gnu-language reqs/code reviews (new task)
  6. SAL req and code reviews feedback - week of 10/14
  7. 653 committee meeting in Lisbon, Portugal Oct 17-21
  • Mark (aka Danger):
  1. A653 Runtime structural coverage (need instructions for abc-web-server)
  2. SAL structural tests (cases and procedures) RFR - 10/28 (at risk)
  3. SAL test updates (review feedback) - 11/4
  4. SAL copyHostData() tests (complex) - 10/28
  5. Kernel test reviews (background task only)

05-Oct-2022

  • Jerry:
  1. 653p2: RFS stuff (In work) - 14 Oct
  2. 653p2: Assess need for cvt reqs in code (DONE)
  3. Trickyfish test h/w setup; + install 1 BL imx8qm (DONE)
  4. Ship skyryse s32 board back (DONE)
  5. Vfile testing
  6. Boot testing
  7. NORflash MAL for shire (D4) - waiting on funding
  • David:
  1. kernel test reviews
  2. SAL test reviews (waiting on Mark)
  3. gnu-language tests for atomics - on HOLD (waiting for Johan to update code/reqs)
  • Johan:
  1. adarts and ada-root: investigating oddity in structural coverage + use of linguistic TLS (DONE)
    • RFS - In work (10 Oct ???)
  2. gnu-language Reqs and Code authorship (estimation in work)
  3. ada examples + OpenArbor - post RFS updates
  4. ToDo Kelly: add task to PM.com (customer & sales support)
  • John:
  1. abc-tool updates for Ada: tested and ready to go stable
  2. SAL reqs and code feedback incorporated - 10/10
  3. Kernel code reviews (highest priority after SAL)
  • Richard: training Kevin Lew
  1. ada reviews (DONE)
  2. p1 reqs and code feedback - waiting on atomics support (no impacts to tests)
  3. p1 test reviews - (DONE)
  4. p1 RFS prep (in work)
  5. Address structural coverage holes (DONE-ish)
  6. kernel code reviews (background task)
  7. SAL req and code reviews feedback - 10/?
  8. 653 committee meeting in Lisbon, Portugal Oct 17-21
  • Mark (aka Danger):
  1. Respond to A653 test file reviews (DONE)
  2. SAL structural tests (cases and procedures) RFR - 10/28 (at risk)
  3. SAL test updates (review feedback) - 11/4
  4. SAL copyHostData() tests (complex) - 10/28
  5. Kernel test reviews

28-Sept-2022

  • Jerry:
  1. 653p2: Assess need for cvt reqs in code
  2. Trickyfish test h/w setup; + install 1 BL imx8qm
  3. Ship skyryse s32 board back
  4. NORflash MAL for shire (D4) - waiting on funding
  • David:
  1. kernel test reviews
  2. SAL test reviews (waiting on Mark)
  3. gnu-language tests for atomics - on HOLD (waiting for Johan to update code/reqs)
  • Johan:
  1. adarts and ada-root: investigating oddity in structural coverage + use of linguistic TLS
    • RFS - waiting on delta reviews (Richard) + investigation outcome
  2. gnu-language Reqs and Code authorship (take over from Aaron)
  3. ada examples + OpenArbor - post RFS updates
  4. ToDo Kelly: add task to PM.com (customer & sales support)
  • John:
  1. abc-tool updates for Ada: unreleased - waiting for confirmation from Johan before going stable; complete assessment of updates to PPC chain
  2. SAL reqs and code feedback incorporated - 10/5
  3. Kernel code reviews (highest priority after SAL)
  • Richard: training Kevin Lew
  1. ada reviews
  2. p1 reqs and code feedback - waiting on atomics support (no impacts to tests)
  3. p1 test reviews - wrap up remaining tests by 9/30
  4. p1 RFS prep + address structural coverage holes
  5. kernel code reviews (background task)
  6. SAL code reviews feedback - 10/?
  7. 653 committee meeting in Lisbon, Portugal Oct 17-21
  • Mark (aka Danger):
  1. Respond to A653 test file reviews - on-going (complete 10/2)
  2. SAL structural tests (cases and procedures) RFR - 10/28 (at risk)
  3. SAL test updates (review feedback) - 11/4
  4. SAL copyHostData() tests (complex) - 10/28
  5. Kernel test reviews

21-Sept-2022

  • Gibbs:
  1. p1 test reviews - Done!
  2. Next Jupiter verf task: celestial Boot
  3. Post-Jupiter verf - TBD
  • Jerry:
  1. 653p2 test case reviews - completion goal 9/23
  2. 653p2: Assess need for cvt reqs in code
  3. boot SATA code reviews
  4. Trickyfish test h/w setup
  5. Post-jupiter verf: eMMC MAL for trickyfish
  • David:
  1. Test Procedure reviews - completion goal 9/28
  2. SAL test reviews (waiting on Mark)
  3. gnu-language tests for atomics - on HOLD (waiting for Johan to update code/reqs)
  • Johan:
  1. gnu-language Reqs and Code authorship (take over from Aaron)
  2. adarts and ada-root: RFS waiting for stable abc-tool
  3. abc-tool: updates provided to John
  • John:
  1. LwIP integration for Bell - high priority (quiet for now)
  2. abc-tool updates for Ada: unreleased EOB Friday (9/23)
  3. SAL reqs and code feedback incorporated - 9/26
  4. Kernel code reviews (highest priority after SAL)
  • Richard: training Kevin Lew
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews - wrap up remaining tests
  3. SAL code reviews feedback - 9/?
  4. 653 committee meeting in Lisbon, Portugal end of Oct
  • Mark (aka Danger):
  1. Respond to A653 test file reviews - on-going (complete 10/2)
  2. A653 structural coverage/justification complete
  3. SAL structural tests (cases and procedures) RFR - 9/30 (at risk)
  4. SAL test updates (review feedback) - 9/21
  5. SAL copyHostData() tests (complex) - 9/30
  6. Kernel test reviews

14-Sept-2022

  • Gibbs:
  1. p1 test reviews - 10/2/2022
  2. Next Jupiter verf task: celestial Boot
  3. Post-Jupiter verf - arinc653 p1 + driver development
  • Jerry:
  1. 653p2 test case reviews - started on 9/12
  • David:
  1. 653p2 Code Reviews - done!
  2. Test Procedure reviews - started 9/12
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs)
  • John: on vacation
  1. LwIP integration for Bell - high priority
  2. abc-tool updates for Ada: updates coming
  3. SAL reqs and code feedback incorporated - 9/14
  4. Kernel code reviews (highest priority after SAL)
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. SAL code reviews feedback - 9/
  4. 653 committee meeting in Lisbon, Portugal end of Oct
  • Mark (aka Danger):
  1. Respond to A653 test file reviews - on-going (complete 10/2)
  2. SAL structural tests (cases and procedures) RFR - 9/30 (at risk)
  3. SAL test updates (review feedback) - 9/21
  4. SAL copyHostData() tests (complex) - 9/30

7-Sept-2022

  • Gibbs:
  1. p1 test reviews - 10/2/2022
  2. Next Jupiter verf task: celestial Boot
  3. Post-Jupiter verf - arinc653 p1 + driver development
  • Jerry:
  1. Remove logbook from CFFS Mainline 3.0.0 unreleased; "experimental" branch 2.0.3 stable with kismet link
  2. Branch cffsapip2 examples to remove logbook on Mainline; leave in on experimental branch for upcoming Durants DDS (Date asap)
  3. DVMS 653apip2 - 2.0.1 unreleased - needs to be stable asap
  4. 653p2 test case reviews - start on 9/12
  • David:
  1. 653p2 Filesystem Test Cases and reqs coverage - done!
  2. 653p2 Code Reviews - 9/14
  3. Test Procedure reviews - next
  4. SAL test reviews (waiting on Mark)
  5. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John: on vacation
  1. IST integration for Bell - done!
  2. abc-tool updates for Ada: stable
  3. SAL reqs and code feedback incorporated - 9/14
  4. Kernel code reviews (highest priority after SAL)
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. SAL code reviews feedback - 9/6
  4. Ada components - another round of updates complete
  5. 653 committee meeting in Lisbon, Portugal end of Oct
  • Mark (aka Danger):
  1. Respond to A653 test file reviews - on-going (complete 10/2)
  2. SAL structural tests (cases and procedures) RFR - 9/30 (at risk)
  3. SAL test updates (review feedback) - 9/21
  4. SAL copyHostData() tests (complex) - 9/30

31-Aug-2022

  • Gibbs:
  1. p1 test reviews - 10/2/2022
  2. Post-Jupiter verf - arinc653 p1 + driver development
  • Jerry:
  1. Remove logbook from Mainline (create "experimental" branch) - today
  2. Update Reqs and Code to remove logbook - tomorrow
  3. CFFS Filesystem 653p2 test procedure development - done!
  4. 653p2 test case reviews - start on 9/6
  • David:
  1. 653p2 Filesystem Test Cases and reqs coverage - done!
  2. 653p2 Reqs, Code and Test Procedure reviews - start on 8/29
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John:
  1. IST integration for Bell - added serial output to LwIP to use on Bell's h/w
  2. abc-tool updates for Ada: unreleased available; creating a test for the final fix
  3. SAL reqs and code feedback incorporated - 9/6
  4. Kernel code reviews (highest priority after SAL)
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. SAL code reviews - 9/6
  4. Ada NFMS quote
  • Mark (aka Danger):
  1. Respond to A653 test file reviews - on-going (complete 10/2)
  2. SAL structural tests (cases and procedures) RFR - 9/30
  3. SAL test updates (review feedback) - 9/21
  4. SAL copyHostData() tests (complex) - 9/30

23-Aug-2022

  • David:
  1. 653p2 Filesystem Test Cases and reqs coverage - 8/26
  2. 653p2 Reqs, Code and Test Procedure reviews - start on 8/29
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • Jerry:
  1. CFFS Filesystem 653p2 test procedure development - 8/26
  2. Remove logbook from Mainline (create Kismet branch) - 8/28
  3. 653p2 test case reviews - start on 8/29
  4. dpaa-prl - test development
  • John:
  1. IST integration for Bell
  2. abc-tool updates for Ada: unreleased available; deos2cygwin issue
  3. SAL reqs and code feedback incorporated - 8/31
  4. Kernel code reviews (highest priority after SAL)
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. Ada reviews (Reqs, Code and Test) - done!
  4. SAL code reviews - 9/6
  • Mark (aka Danger):
  1. Respond to A653 test file reviews - on-going
  2. SAL structural tests (cases and procedures) RFR - 9/30
  3. SAL test updates (review feedback) - 9/21
  4. SAL copyHostData() tests (complex) - 9/30
  • Gibbs:
  1. p1 test reviews - TBD
  2. Post-Jupiter verf - arinc653 p1 + driver development

15-Aug-2022

  • David:
  1. 653p2 Filesystem Test Cases and reqs coverage - 2 TCs remaining (8/19)
  2. 653p2 Code and Test Procedure reviews
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John:
  1. abc-tool updates for Ada: 2.x remaining test suite vetting - 8/17 goal
  2. SAL reqs and code feedback incorporated (2-3 days)- on-going
  3. Kernel code reviews (highest priority after SAL)
  • Jerry:
  1. CFFS Filesystem 653p2 test procedure development - 8/19
  2. 653p2 test case reviews
  3. Remove logbook APIs from cffs653apip2 - Bell doesn't need it
    • Still need to be able to build the P2 library to include Logbook on Kismet (fixed before RFS)
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. Ada code reviews - waiting for TLS solution
  4. SAL code reviews (waiting on author)
  • Mark (aka Danger):
  1. Respond to A653 test file reviews and get test suite running on celestial (low priority) - on-going
  2. Ada test updates and reviews - on stand-by for additional work
  3. SAL structural tests (cases and procedures) RFR - Aug ?
  4. cffs653apip2 code and test reviews - later
  • Gibbs:
  1. p1 test reviews first pass - slogging on (8/12 not realistic)
  2. Post-Jupiter verf - arinc653 p1 + driver development

08-Aug-2022

  • David:
  1. 653p2 Test Cases and reqs coverage - 3 TCs remaining (8/19)
  2. 653p2 Test Cases (Log Book) - can be started
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John:
  1. abc-tool updates for Ada: 2.x remaining test suite vetting - 7/22
  2. SAL reqs and code feedback incorporated (2-3 days)- on-going
  3. cffs653apip2 code reviews - begin week of 7/??
  4. IST updates (background) - 8/5 stable
  5. Kernel code reviews (lowest priority)
  • Jerry:
  1. CFFS 653p2 test procedure development working logbook - 8/29
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. Ada code and test reviews - awaiting response from author (Johan)
  4. SAL code reviews (waiting on author)
  • Mark (aka Danger):
  1. Respond to A653 test file reviews and get test suite running on celestial (low priority) - on-going
  2. Ada test updates and reviews - on stand-by for additional work
  3. SAL structural tests (cases and procedures) RFR - Aug ?
  4. cffs653apip2 test reviews - later
  • Gibbs:
  1. p1 test reviews first pass - slogging on (8/12 not realistic)
  2. Post-Jupiter verf - arinc653 p1 + driver development
  • Kelly:
  1. Add 653p1 redesign to PM.com (GE Michigan requires support for interrupts in Kismet)

27-July-2022

  • David:
  1. 653p2 Test Cases and reqs coverage - working with Jerry and Richard
  2. 653p1 test authorship in Mark's absence
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John:
  1. abc-tool updates for Ada: 2.x remaining test suite vetting - 7/22
  2. SAL reqs and code feedback incorporated (2-3 days)- on-going
  3. cffs653apip2 code reviews - begin week of 7/??
  4. IST updates (background) - 8/5 stable
  5. Kernel code reviews (lowest priority)
  • Jerry:
  1. CFFS 653p2 test procedure development; filesystem done (but working on instrumented coverage), working logbook - 7/29
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. Ada code and test reviews - providing feedback
  4. SAL code reviews (waiting on author)
  • Mark (aka Danger):
  1. Respond to A653 test file reviews and get test suite running on celestial (low priority) - on-going
  2. Ada test updates and reviews - complete
  3. SAL structural tests (cases and procedures) RFR - Aug ?
  4. cffs653apip2 test reviews - later
  • Gibbs:
  1. p1 test reviews first pass - slogging on (8/12 not realistic)
  2. Post-Jupiter verf - arinc653 p1 + driver development
  • Kelly:
  1. Add 653p1 redesign to PM.com (GE Michigan requires support for interrupts in Kismet)

20-July-2022

  • David:
  1. ANSI ready for RFS!
  2. 653p2 Test Cases - working with Jerry and Richard
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John:
  1. abc-tool updates for Ada: 3 remaining test suite vetting - 7/22
  2. SAL reqs and code feedback incorporated (2-3 days)- on-going
  3. cffs653apip2 code reviews - begin week of 7/??
  4. IST updates (background) - 8/5 stable
  5. Kernel code reviews (lowest priority)
  • Jerry:
  1. CFFS 653p2 test procedure development; filesystem done (but working on instrumented coverage), working logbook - 7/29
  2. NORflash MAL for celestial's TDL - Matt will pick this up
  • Richard:
  1. p1 reqs and code feedback - waiting on atomics support
  2. p1 test reviews
  3. Ada code reviews (provided feedback)
  4. SAL code reviews (waiting on author)
  • Mark (aka Danger):
  1. Ada test updates and reviews (for files authored by others) - background task (must be complete before vacation)
  2. SAL structural tests (cases and procedures) RFR - Aug ?
  3. Respond to A653 test file reviews (on-going)
  4. cffs653apip2 test reviews - later
  • Gibbs:
  1. p1 test reviews first pass - slogging on (8/12 not realistic)
  2. Post-Jupiter verf - arinc653 p1 + driver development
  • Kelly:
  1. Add 653p1 redesign to PM.com (GE Michigan requires support for interrupts in Kismet)

13-July-2022

  • David:
  1. ANSI test reviews - goal is 7/15 (Johan is going to do RFS activities)
  2. 653p2 Test Cases - working with Jerry and Richard
  3. SAL test reviews (waiting on Mark)
  4. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  • John:
  1. abc-tool updates for Ada: 4 remaining test suite vetting; issue with it.conf to be addressed in Kismet - 7/22
  2. SAL reqs and code feedback incorporated (2-3 days)- on-going
  3. cffs653apip2 code reviews - begin week of 7/??
  4. IST updates (background) - 8/5 stable
  5. Kernel code reviews (lowest priority)
  • Jerry:
  1. CFFS 653p2 test procedure development; filesystem done, working logbook - 7/29
  2. NORflash MAL for celestial's TDL - Matt will pick this up
  • Richard:
  1. kernel reqs reviews (core support updates)
  2. p1 reqs and code feedback - waiting on atomics support and cvt reqs update for 1 file
  3. p1 test reviews
  4. Ada code reviews (waiting on author) - 7/15
  5. SAL code reviews (waiting on author)
  • Mark (aka Danger):
  1. SAL structural tests (cases and procedures) RFR - Aug ?
  2. Respond to A653 test file reviews (on-going)
  3. ada reqs reviews done!
  4. Ada test updates - background task (must be complete before vacation)
  5. cffs653apip2 test reviews - later
  • Gibbs:
  1. p1 test reviews - slogging on (8/12 not realistic)
  2. Post-Jupiter verf - driver development
  • Kelly:
  1. Add 653p1 redesign to PM.com (GE Michigan requires support for interrupts in Kismet)

27-June-2022

  • Richard - on vacation
  • David:
  1. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs); Kelly to update PM.com dates
  2. 653p2 Test Cases - working with Jerry and Richard
  3. ANSI test reviews - goal is 7/1
  4. SAL test reviews (waiting on Mark)
  • John:
  1. abc-tool updates for Ada (test suite looksie) - 6/30
  2. SAL reqs and code feedback incorporated (2-3 days)- on-going
  3. cffs653apip2 code reviews - begin week of 6/??
  4. Kernel code reviews (lowest priority)
  • Jerry:
  1. CFFS 653p2 reqs/code author - complete!
  2. CFFS 653p2 test procedure development - 7/29
  3. NORflash MAL for celestial's TDL - hoping Dan will pick this up
  • Richard:
  1. p2 reqs - done!
  2. p1 code feedback - waiting on atomics support and cvt reqs update
  3. p1 test reviews
  4. SAL code reviews (waiting on author)
  5. Ada code reviews (waiting on author)
  • Mark (aka Danger):
  1. SAL tests (cases and procedures) RFR - 7/8
  2. Respond to A653 test file reviews (on-going)
  3. ada reqs reviews - 7/7
  4. cffs653apip2 test reviews - later
  • Gibbs:
  1. p1 test reviews - slogging on (8/12)
  2. Post-Jupiter verf - driver development

20-June-2022

  • Out: Gibbs and Sygrove
  • David:
  1. gnu-language tests for atomics - on HOLD (waiting for Aaron to update code/reqs)
  2. 653p2 Test Cases - working with Jerry and Richard
  3. ANSI test reviews - goal is 7/1
  4. SAL test reviews (waiting on Mark)
  • John
  1. abc-tool updates for Ada - 6/24
  2. OA build update PCR ???
  3. SAL reqs and code feedback incorporated - on-going
  4. cffs653apip2 code reviews - begin week of 6/??
  5. Kernel code reviews (lowest priority)
  • Jerry
  1. CFFS 653p2 reqs/code author - date TBD
  2. CFFS 653p2 test procedure development - date TBD
  3. NORflash MAL for celestial's TDL
  • Richard
  1. p2 reqs - 6/23
  2. p1 code feedback - waiting on atomics support and cvt reqs update
  3. p1 test reviews
  4. SAL code reviews (waiting on author)
  5. Ada reqs and code reviews (waiting on author)
  • MJ
  1. GPIO tests - 6/24
  2. Backup farmer on Thurs & Fri; train/shadow Jerry Mon-Wed

06-June-2022

  • Gibbs:
  1. Continuing code reviews on 653p1-runtime (6/17)
  • David:
  1. gnu-language tests for TLS in progress (RFR 6/6)
    1. TLS might be moved to another component
  2. gnu-language tests for atomics (working on structural coverage)
  3. available for other work (A653 Runtime test reviews?)
  4. SAL test reviews (work in the background)
  • Mark:
  1. SAL tests (cases and procedures) RFR - 6/17
  2. Respond to A653 test file reviews (on-going)
  3. cffs653apip2 tests - week of 6/13
  • John
  1. abc-tool updates for Ada - need to provide date to Kelly when abc-tool will be ready for Tostones verf (6/17)
  2. SAL reqs and code feedback incorporated - on-going
  3. cffs653apip2 code reviews - begin week of 6/?? (waiting on requirements and abc-tool tasks)
  4. Kernel code reviews (lowest priority)
  • Jerry
  1. CFFS 653p2 reqs/code author - 6/9 (Thursday)
    1. Reqs reviews identified missing functionality in code (Jerry to follow up with Richard)
  2. CFFS 653p2 test procedure development - (after req/code is completed ...TBD)
  • Richard
  1. p1 code feedback
  2. waiting on p2 reqs (waiting on author)
  3. SAL code reviews (waiting on author)
  4. Ada reqs and code reviews (waiting on author)
  5. p1 test reviews

23-May-2022

Gibbs:

  • Consider development of RS-422 driver for Skyryse s32v234
    • Also need to port it to the imx8qm (A72)
  • Continuing code reviews on 653p1-runtime
  • David:
  1. gnu-language tests for TLS in progress, need help from Aaron
  2. gnu-language tests for atomics on HOLD, awaiting feedback from Aaron
  3. SAL test reviews (work in the background)
  • Mark:
  1. 653 runtime structural coverage hole + code issues impacting tests - all tests RFR!
    • Will run test suite again with lwip-4.7.2
  2. SAL tests (cases and procedures) RFR - 6/10
  3. cffs653apip2 tests - week of 6/13
  • John
  1. LwIP-4.7.2 is stable
  2. abc-tool updates for Ada - need to provide date to Kelly when abc-tool will be ready for Tostones verf
  3. SAL reqs and code feedback incorporated - on-going
  4. cffs653apip2 code reviews - begin week of 6/?? (waiting on requirements and abc-tool tasks)
  5. Kernel code reviews (lowest priority)
  • Jerry
  1. CFFS 653p2 reqs/code author - 5/31 (Friday)
    • Reqs reviews identified missing functionality in code (Jerry to follow up with Richard)
  2. CFFS 653p2 test procedure development - TBD
  • Richard
  1. Onboarding Sam and supporting Brian
  2. p1 and p2 reqs feedback
  3. SAL reviews
  4. Ada reqs and code reviews; ARM processor analysis feeds in to review process (ie, baseline or diff reviews)

16-May-2022

  • David and Gibbs on vacation
  • John
  1. LwIP issue - stable by 5/17
  2. abc-tool updates for Ada - 5/27
  3. SAL reqs and code feedback incorporated - on-going
  4. cffs653apip2 code reviews - begin week of 6/1 (waiting on requirements)
  5. Kernel code reviews (lowest priority)
  • Mark:
  1. 653 runtime structural coverage hole + code issues impacting tests - 5/20
  2. SAL tests (cases and procedures) - 5/31
  3. cffs653apip2 tests - week of 6/1
  4. ANSI test development - TBD
  • Jerry
  1. CFFS 653p2 reqs/code author - 5/31 (Friday)
    • If possible, identify code files ready for review (filesystem)
  2. CFFS 653p2 test procedure development - TBD
  3. D4d Celestial TDL MALs (SATA and NORflash) - 8/6/2022 stable (support Dan)

9-May-2022

  • John
  1. SAL reqs and code feedback incorporated - on-going
  2. abc-tool updates for Ada - 5/20
  3. cffs653apip2 code reviews - begin week of 5/16 (waiting on requirements)
  4. Kernel code reviews (lowest priority)
  • Richard:
  1. SAL feedback to John - code review comments
  2. 653p2 reqs reviews - 6/3 (docbook 5 updates after reqs reviews are complete)
  3. GDB updates for Ada support - 6/10
  4. 653 runtime code - document use of Atomics - waiting on gnu-language (Aaron)
  • Mark:
  1. 653 runtime structural coverage holes - 1 remaining
  2. SAL tests (cases and procedures) - 5/31
  3. ANSI test development - TBD
  • David:
  1. gnu-language test updates: TLS (updates for Linux) + atomics (~50% structural coverage at the moment)- 5/27 (Aaron working reqs/code updates 5/13/2022)
  2. SAL test reviews - waiting on Mark (after 6/1)
  3. cffs653p2 test reviews - waiting on Richard/Jerry (low priority)
  • Kelly
  1. ToDo: Get well soon (don't be sick)
  2. ToDo: can time verf be pushed out post-jupiter verf?
  • Jerry
  1. CFFS 653p2 reqs/code author - 5/13 (Friday)
    • If possible, identify code files ready for review (filesystem)
  2. CFFS 653p2 test procedure development- currently scheduled to be complete by 5/???
  3. D4d Celestial TDL MALs (SATA and NORflash) - 8/6/2022 stable
  • Farming Tasks:
  1. Boeing/T-38 and Eureka (Varicite) imx8qm - waiting for board to come back with jtag connector
  • Gibbs
  1. 653p1 code reviews ongoing

2-May-2022

  • John
  1. SAL reqs and code feedback incorporated - 5/6 (stable)
  2. abc-tool updates for Ada - 5/20
  3. cffs653apip2 code reviews - begin week of 5/9
  4. Kernel code reviews (lowest priority)
  • Richard:
  1. SAL feedback to John - 5/4
  2. 653p2 reqs reviews - 6/3 (docbook 5 updates after reqs reviews are complete)
  3. GDB updates for Ada support - 6/10
  4. 653 runtime reqs - adding support for A72
  5. 653 runtime code - document use of Atomics - waiting on gnu-language
  • Mark:
  1. 653 runtime structural coverage holes - 1 remaining
  2. SAL tests (cases and procedures) - 5/31
  3. ANSI test development - TBD
  • David:
  1. gnu-language test updates: TLS (updates for Linux) + atomics (~50% structural coverage at the moment)- 5/27 (Aaron working reqs/code updates 5/13/2022)
  2. cffs653p2 test reviews - waiting on Richard/Jerry (after 4/29)
  3. SAL test reviews - waiting on Mark (after 5/??)
  • Kelly
  1. ToDo: can time verf be pushed out post-jupiter verf?
  • Jerry
  1. CFFS 653p2 reqs/code author - 5/6
    • If possible, identify code files ready for review (filesystem)
  2. CFFS 653p2 test procedure development- currently scheduled to be complete by 5/???
  3. D4d Celestial TDL MALs (SATA and NORflash) - 8/6/2022 stable
  • Farming Tasks:
  1. Woodward (Louie): h/w shipped back
  2. Boeing/T-38 and Eureka (Varicite) imx8qm - boards don't have jtag connector. h/w shipping back to skyryse once power supply arrives
  3. GD (Shire): zu6 arrived - dealing with Lauterbach issues
  • Gibbs
  1. 653p1 runtime reqs reviewed - 4/29
  2. 653p1 code reviews starting
  3. Mentors: Richard and Mark

25-Apr-2022

  • John
  1. Ready to go stable on rtems-socket-interface and LwIP
  2. SAL reqs and code feedback incorporated - 4/29
  3. cffs653apip2 code reviews - begin week of 4/25
  4. Kernel code reviews (lowest priority)
  • Richard:
  1. 653 runtime reqs - adding support for A72
  2. 653 runtime code - document use of Atomics - waiting on gnu-language
  • Mark:
  1. 653 runtime structural coverage holes; Richard fixed 5 code holes. Additional tests needed. - 4/29
  2. SAL tests (cases and procedures) - 5/31
  3. ANSI test development - TBD
  • David:
  1. gnu-language test updates: TLS (updates for Linux) + atomics (~50% structural coverage at the moment)- 5/27 (Aaron working reqs/code updates 5/13/2022)
  2. cffs653p2 test reviews - waiting on Richard/Jerry (after 4/29)
  3. SAL test reviews - waiting on Mark (after 5/??)
  4. time test development - 6/???
  • Jerry
  1. CFFS 653p2 reqs/code author - 4/29
    • If possible, identify code files ready for review (filesystem)
  2. CFFS 653p2 test procedure development- currently scheduled to be complete by 5/???
  3. D4d Celestial TDL MALs (SATA and NORflash) - 8/6/2022 stable
  • Farming Tasks:
  1. Woodward (Louie): h/w shipped back
  2. Boeing/T-38 and Eureka (Varicite) imx8qm - boards don't have jtag connector. Kelly to follow up with Bill.
  3. Skyryse (Eureka): s32v234 (will go on the DDCI farm) and imx8-A72 (will go to Protologics)
  4. GD (Shire): zu6 arrived - Kelly created a PO a Lauterbach converter
  • Gibbs
  1. 653p1 runtime reqs reviewed - 4/29
  2. Mentors: Richard and Mark

18-Apr-2022

  • John - confirmed that 120 hours LOE is realistic
  1. cffs653apip2 code reviews - begin week of 4/25 (lower priority)
  2. Kernel code reviews (lowest priority)
  • Mark:
  1. SAL tests (cases and procedures) - 5/31
  2. 653 runtime structural coverage holes; Richard fixed 5 code holes. Additional tests needed.
  3. ANSI test development - TBD
  • David:
  1. gnu-language test updates: TLS (updates for Linux) + atomics (~50% structural coverage at the moment)- 4/22 (Aaron working reqs/code updates)
  2. cffs653p2 test reviews - waiting on Richard/Jerry (after 4/29)
  3. SAL test reviews - waiting on Mark (after 5/??)
  4. time test development - 6/???
  • Jerry
  1. Woodward (Louie): h/w arrived. High priority. Use Lauterbach 3 + Cable 12.
  2. Boeing/T-38 imx8qm: High priority. Use Lauterbach 6.
  3. CFFS 653p2 reqs/code author - 4/25
    • If possible, mark some code files ready for review
  4. CFFS 653p2 test procedure development- currently scheduled to be complete by 4/??
  5. D4c Celestial TDL MALs (SATA and NORflash) - 7/8/2022 (can slide til 8/6)
  6. Skyryse (Eureka): s32v234 (will go on the DDCI farm) and imx8-A72 (will go to Protologics)
  7. GD (Shire): zu6 arriving ???
  • Gibbs
  1. 653p1 runtime reqs reviewed - 4/29
  2. Mentors: Richard and Mark

11-Apr

  • Kelly: ToDo - confirm there's a task to add CVT reqs to 653 runtime code
  • Richard:
  1. SAL code reviews - 4/13
  2. cffs653apip2 req feedback to Jerry - Done; waiting for Jerry to incorporate feedback
  3. gdb updates for Tostones - 5/6 at risk (evaluate before informing customer on debugger option)
  4. cffs653apip2 test cases (file system and logbook) - on hold until Reqs are in a good state
  • John:
  1. SAL Code & Reqs - working feedback (from Richard) - 4/8
    • New test point needed: when connection deleted; see MTL example and talk to Mark
  2. socket/LwIP updates: rtems-socket-interface stable - 4/20
  3. cffs653apip2 code reviews - 4/?? (TBD)
  4. abc-tool - support Ada ARM test suite - needed for Tostones verf (needed by 5/13)
    • John - determine if 120 hours LOE is realistic
  5. Kernel code reviews
  • Mark:
  1. SAL tests (cases and procedures) - 4/29 at risk
  2. 653 runtime structural coverage holes; Richard fixed 5 code holes. Additional tests needed
  3. Support Dave Gibbs on 653 runtime test and req reviews
  4. ANSI test development - TBD
  • David: on vacation through 4/4/2022
  1. gnu-language test updates: TLS (updates for Linux) + atomics (~50% structural coverage at the moment)- 4/22 (Aaron working reqs/code updates)
  2. cffs653p2 test reviews - waiting on Richard/Jerry (after 4/15)
  3. SAL test reviews - waiting on Mark (after 4/29)
  4. time test development - waiting on Matt/Ron
  • Jerry
  1. CFFS 653p2 reqs/code author - 4/15
  2. CFFS 653p2 test procedure development- currently scheduled to be complete by 4/??
  3. D4c Celestial TDL MALs (SATA and NORflash) - 7/8/2022
  4. Remove 2 Harrys targets from the farm - shipped 4/7
  5. GD (Shire): zu6 arriving ???
  6. Woodward (Louie): h/w arrived. Kelly to identify priority for farming this board.
  7. Skyryse (Eureka): s32v234 (will go on the DDCI farm) and imx8-A72 (will go to Protologics)
  • Gibbs
  1. 653p1 runtime reqs reviewed - 4/29
  2. Mentors: Richard and Mark

4-Apr

  • Richard:
  1. runtime-9999 stable for desert eagle - 4/7
  2. SAL code reviews - 4/13
  3. cffs653apip2 req feedback to Jerry - 4/15
  4. gdb updates for Tostones - 5/6 at risk (evaluate before informing customer on debugger option)
  5. cffs653apip2 test cases (file system and logbook) - on hold until Reqs are in a good state
  • John:
  1. SAL Code & Reqs - working feedback (from Richard) - 4/8
  2. socket/LwIP updates: rtems-socket-interface stable - 4/15
  3. cffs653apip2 code reviews - 4/?? (TBD)
  4. abc-tool - support Ada ARM test suite - needed for Tostones verf (needed by 5/13)
    • John - determine if 120 hours LOE is realistic
  5. Kernel code reviews
  • Mark:
  1. SAL tests (cases and procedures) - 4/29 at risk
  2. 653 runtime structural coverage holes - 4/?? (Richard assessing code/tests to identify the fix)
  3. Support Dave Gibbs on 653 runtime test and req reviews
  4. ANSI test development - TBD
  • David: on vacation through 4/4/2022
  1. gnu-language test updates: TLS + atomics - 4/22(Ryan and Aaron working reqs/code)
  2. cffs653p2 test reviews - waiting on Richard/Jerry (after 4/15)
  3. SAL test reviews - waiting on Mark (after 4/29)
  4. time test development - waiting on Matt (5/1)
  • Jerry
  1. CFFS 653p2 reqs/code author - 4/15
  2. CFFS 653p2 test development- currently scheduled to be complete by 4/15
  3. D4c Celestial TDL MALs (SATA and NORflash) - pushed out (date TBD)
  4. Remove 2 Harrys targets from the farm (to make room for the incoming class)
  • Dave
  1. 653p1 runtime reqs reviewed - 4/29
    • 6500 core reqs are new - but it's the same set of registers as the ARM core verf'd on harrys
  2. Mentors: Richard and Mark

28-Mar-2022

  • Richard:
  1. SAL code reviews - 4/6
  2. cffs653apip2 req feedback to Jerry - 4/15
  3. gdb updates for Tostones - 5/6 (may be deferred)
  4. cffs653apip2 test cases (file system and logbook) - on hold until Reqs are in a good state
  • John:
  1. SAL Code & Reqs - working feedback (from Richard) - 4/6
  2. cffs-sata-atapi code reviews - done!
  3. socket/LwIP updates: rtems-socket-interface stable - 4/15
  4. cffs653apip2 code reviews - 4/15 (TBD)
  5. abc-tool - support Ada ARM test suite - needed for Tostones verf (needed by 5/13)
    • John - determine if 120 hours LOE is realistic
  6. Kernel code reviews
  • Mark:
  1. SAL tests (cases and procedures) - 4/29
  2. 653 runtime tests - Done!
  3. 653 runtime structural coverage - 4/1
  4. Week of 3/21 and 3/28 - train Dave Gibbs on 653 runtime test and req reviews
  5. ANSI test development - TBD
  • David:
  1. gnu-language test updates: TLS + atomics - 4/22(Ryan and Aaron working reqs/code)
  2. cffs653p2 test reviews - waiting on Richard/Jerry (after 4/15)
  3. SAL test reviews - waiting on Mark (after 4/29)
  4. time test development - waiting on Matt (5/1)
  • Jerry
  1. CFFS 653p2 reqs author - 4/15
  2. CFFS 653p2 test development- currently scheduled to be complete by 4/15
  3. D4c Celestial TDL MALs (SATA and NORflash) - 6/3
  • Dave
  1. 653p1 runtime reqs reviewed - 4/29


14-Mar-2022

  • John:
  1. SAL Code - working feedback (from Richard) - 3/15
  2. cffs-sata-atapi code reviews - 3/16 (send feedback to Steven in Jerry's absence)
  3. cffs653apip2 code reviews - 4/15
  • Mark:
  1. SAL tests (cases and procedures) - 3/30
  2. 653 runtime tests - resolving remaining issues 3/14
  3. Week of 3/21 and 3/28 - train Dave Gibbs on 653 runtime test and req reviews
  • David:
  1. gnu-language test updates: TLS + atomics - 4/22(Ryan and Aaron working reqs/code)
  2. cffs653p2 test reviews - waiting on Mark/Jerry
  3. SAL test reviews - waiting on Mark
  4. time test development - waiting on Matt
  • Jerry and Richard
  1. CFFS 653p2 test development- currently scheduled to be complete by 3/31

7-Mar-2022

  • John:
  1. SAL Code - working feedback
  2. cffs-sata-atapi code reviews - 3/16
  3. cffs653apip2 code reviews (Jerry to review files he hasn't authored - logbook)
  • Mark:
  1. CFFS 653p2 test cases - currently scheduled to be complete by 3/31
  2. 653 runtime reqs reviews - waiting on Richard's tasks
  3. SAL tests - several weeks
  • David:
  1. gnu-language test updates: TLS + atomics - 4/22(Ryan and Aaron working reqs/code)
  2. 653 p1 runtime - energize status files (start with files from indie verf)
  3. cffs653p2 test reviews - waiting on Mark/Jerry
  4. SAL test reviews - waiting on Mark
  5. time test development - waiting on Matt
  • Jerry:
  1. celestial-3 on the farm 3/7
  2. come-ctl6 back on the farm - 3/7
  3. SATA atapi test case reviews - done (Steven incorporating feedback)
  4. CFFS 653p2 test procedures - work with Mark on test cases 3/31
  5. Celestial MALs for TDL (SSD and NOR MAL) - date TBD (Kelly to set up meeting with Matt/Bill)
  6. Support Steven - SATA atapi verf (RFS+misc) - 3/25

28-Feb-2022

  • John:
  1. SAL Reqs/Code - working feedback
  2. cffs-sata-atapi code reviews
  3. cffs653apip2 code reviews (Jerry to review files he hasn't authored - logbook)
  • Mark:
  1. 653 runtime tests: Done - known issue running tests on qemu, but this is not a test issue
  2. 653 runtime reqs reviews - provided feedback to Richard; updates should be completed by 3/8
  3. CFFS 653p2 test cases - currently scheduled to be complete by 3/16
  4. SAL tests - several weeks
  • David:
  1. gnu-language test updates: TLS + atomics (Ryan and Aaron working reqs/code)
  2. runtime - energize status files
  3. cffs653p2 test reviews
  4. SAL test reviews
  5. time test development
  • Jerry: would rather be sipping Mai Tais in Hawaii
  1. celestial-3 on the farm (use host from desert eagle green label targets)
  2. SATA atapi test case reviews - 3/4
  3. CFFS 653p2 test procedures - work with Mark on test cases 3/16
  4. SATA atapi verf (RFS+misc) - 3/25

7-Feb-2022

  • John:
  1. SAL Reqs/Code R4R
  2. cffs-sata-atapi code reviews
  3. cffs653apip2 code reviews
  • Mark:
  1. 653 runtime tests - updated by 2/11
  2. 653 runtime reqs reviews - updated by ???
  3. CFFS 653p2 test cases - currently scheduled to be complete by 3/2
  4. SAL tests - several weeks
  • Jerry:
  1. Getting PC ordered for 1553 card
  2. CFFS 653p2 test procedures - work with Mark on test cases 3/2
  3. SATA atapi test case reviews - 3/4
  4. SATA atapi verf (RFS+misc) - 3/25


31-Jan-2022

  • David:
  1. cffs-server test procedure (reviews) - complete 2/11
  2. 653p1 runtime - energize status files, start test reviews
  3. deos-time tests (Matt is the developer) - get test status
  4. SAL tests - on HOLD
  • Jerry:
  1. di2c-nxp test approach - independent of vfile (only pulls in vfile header) - goal: 2/4
  2. CFFS 653p2 test procedures - work with Mark on test cases
  3. SATA atapi test case reviews
  4. di2c-nxp verf (to use as a template for the SPI driver verf by Syspro)
  • Mark:
  1. 653 runtime tests - get status on tests (% complete)
  2. CFFS 653p2 functional desc review - by 2/4
  3. CFFS 653p2 test cases - 3 weeks of effort
  4. SAL tests - several weeks

24-Jan-2022

  • John:
  1. MTL verf
  2. SAL verf
  3. SATA atapi MAL code reviews
  • Mark:
  1. SAL tests - several weeks
  2. CFFS 653p2 test cases
  3. 653 runtime tests
  • Jerry:
  1. di2c-nxp test approach
  2. CFFS 653p2 test procedures
  3. SATA atapi test reviews
  • David:
  1. cffs-server test procedure (reviews) - complete 2/11
  2. deos-time tests (Matt is the developer) - get status on current tests
  3. SAL tests - on HOLD
  • General
    • Issue with line feed set to "native" - add to Deos Team Meeting

10-Jan-2022

  • Is this meeting necessary/helpful? yes!
  • John:
    • Getting MTL ready for RFS; plan CCB on Wed
      • Issue - tests failing for John, but not Mark and David. Possibly a h/w difference causing issues.
      • Goal - later this week (1/14/2022)
    • Working SAL issue and reqs/code ready for review
  • Mark:
    • Ask "bsp-team" (email group alias) which celestial target to use for regression test run
    • Need to update SAL tests (2 months) - pushes SAL verf out to end of March
  • Jerry:
    • atapi-MAL reqs/code ready for review; test procedures complete and passing
      • Kelly: re-assign req reviews
      • Kelly: assign test case development to CR (Steven?)
    • cffs-server
      • ASSERT_UNREACHABLE macro - ask Ron
      • Reviewing reqs - complete today!
  • David:
    • Back to cffs-server test cases and procedures